Sovereign by construction
Hardware, energy and operator in the EU. Open-weight models, and your data stays in the EU.
Inference doesn't need gigafactories. It needs a grid of micro-sites.
AI is short of power. Micro-sites have it: farms, industrial buildings, renewable producers. We put the GPUs where the energy is and wire every site into one grid, without compromising on three things.
Renewable power capacity across the AI-Grid, from biogas, solar and wind producers.
Hardware, energy and operator in the EU. Open-weight models, and your data stays in the EU.
Racks sit where the power is: biogas, solar, wind, or an existing grid interconnection. Capacity does not wait years for new lines.
Modular shells we design and build for our own needs. A site grows by adding modules.
Six layers between a site's energy and your API call. We build and run all of them.
Model endpoints, billed per token
Energy-aware orchestration across sites
AMD and NVIDIA, chosen per workload
Modular shell, liquid cooled, built in house
Biogas, solar, wind or grid on a direct line
Micro-sites: farms, industrial buildings, grid-connected land
Distributed and highly resilient.
We focus on micro-sites with spare power: farms, industrial buildings, renewable producers or a plain grid connection. We start in France and Belgium, then Germany. By December 2029 the AI-Grid reaches 248 sites, all feeding one API. Our 2029 plan targets 85% renewable power.
Start with an endpoint. Move to dedicated capacity when your volume justifies it. Same grid underneath.
Open-weight models behind an API. You send prompts, we bill tokens.
AMD and NVIDIA GPUs on bare metal or Kubernetes, for fine-tuning, batch jobs and evaluation.
A full module dedicated to you, on a site you can visit, on monthly or yearly terms.
Jobs run where power is available, and GPU power follows each site's energy budget.
Failover between sites, load balancing across the grid, and jobs placed where energy is available and cheapest.
The cooling loop hands GPU heat to the site and its neighbours. Selling that heat pays for the cooling.

We design and build our modules ourselves, for our own needs. Each one holds a GPU rack, its cooling loop and its power backup, next to the producer.
Inference from EU micro-sites running on renewable energy. Capacity goes to the first signed customers: tell us your model, your monthly token volume and when you need it.
contact@cairnode.aiFarms, industrial buildings, renewable producers. If you have 100 kW or more of spare power and a little land, we install a module on your site, buy your energy and give the heat back.
Our sales team will reach out to you shortly.
Log in or join the waiting list to start using sovereign EU tokens.
Access your endpoints, keys and usage.
The EU Token Factory is open to current customers only while we bring new capacity online. Join the waiting list and we'll invite you as soon as a seat opens.
New here? Join the waiting list